“The plug and play convenience of the E-Z TREAT
filter unit greatly simplifies system design and instillation. With
the complete pre-packed E-Z TREAT filter bed, you don’t need to
locate a suitable media in each area—you will always get consistent
performance.”
David Venhuizen, P.E. Read more on High-Performance
Biofiltration: Where Sand Filters Have Gone @ http://www.venhuizen-ww.com/
- The E-Z TREAT system treats residential wastewater
meeting Type I and II (with the addition of the E-Z TREAT Ultraviolet
Disinfector.) standards.
- A single E-Z TREAT system is capable of treating houses
of up to five bedrooms or 600 GPD.
- The two pump design ensures 100% effluent treatment
before discharge.
- System design allows for even effluent distribution
and complete drainage of systems,increasing system efficiency.
- Vessel designed with ventilation, and drainage eliminating
in the field piping.
- Greater treatment efficiency results in a smaller system
footprint.
- System is lightweight and pre-packed for quick installation.
- System components are designed for ease of maintenance.
The E-Z TREAT system is a re-circulating fixed-media-filter
media filter offering an innovative treatment solution to the onsite industry.
The key to the system is the Synthetic Filter, a mattress of synthetic
media surrounded by a sturdy, watertight, specially designed vessel.
The lightweight, synthetic media is a spherical plastic, providing the
most treatment surface area per cubic foot of any treatment media currently
being utilized in the septic industry. The vessel enclosing the media
is designed to provide for maximum oxygenation of the effluent and complete
drainage after dosing. Combined these innovations create a very
efficient treatment environment with a small footprint.
The E-Z TREAT System is a re-circulating synthetic media
filter designed to treat residential strength septic tank effluent .
The typical system consists of the following components:
- A two compartment septic tank with an E-Z SET approved
effluent filter. The tank must be built and sized in accordance with
local regulations and E-Z SET guidelines.
- A baffled re-circulating tank with dual effluent pumps.
Pump one doses the effluent in to the treatment vessel. Pump two
pumps the effluent to be discharged.
- E-Z TREAT Synthetic Filter Vessel. The patented
design of the E-Z TREAT Vessel allows for a more even effluent dispersal,
efficient oxygenation of the effluent, and complete drainage of the
system once the treatment cycle is completed.
- Form of effluent dispersal
Performance:
Typical Influent Strength
| Characteristic |
Average
Mg/L |
Maximum
Mg/L |
| CBOD5 |
140 |
300 |
| TSS |
50 |
150 |
| TKN |
70 |
150 |
| G&O |
20 |
25 |
Typical Effluent Strength:
| Characteristic |
Average
Mg/L |
| CBOD5 |
10 |
| TSS |
10 |
Performance based on one year of lab testing, with third
party verification tests.
E-Z Treat System Test Results
Years 2003-2004
The influent used to test the E-Z Treat System is hauled
in daily from local septic tank cleaning companies.
Years 2003-2004
| TEST DATES |
BOD |
TSS |
| Nov 14-24 |
14-12 |
12-12 |
| Dec 4-19-30 |
12-9-11 |
10-11-12 |
| Jan 12-26 |
11-11 |
9-12 |
| Feb 11-27 |
10-9 |
9-12 |
| Mar 15-31 |
11-9 |
10-11 |
| Apr 19-30 |
11-11 |
10-14 |
| May 12-28 |
9-10 |
11-9 |
| Jun 10-28 |
10-9 |
11-8 |
| Jul 19-30 |
9-11 |
9-10 |
| Aug 10-30 |
9-8 |
11-10 |
| Sep 14-29 |
10-9 |
9-10 |
E-Z Treat System Test Results
Years 2003-2004
| Monthly Average |
BOD |
TSS |
| OCT |
14 |
12.7 |
| NOV |
13 |
12 |
| DEC |
10.7 |
11 |
| JAN |
11 |
10.5 |
| FEB |
9.5 |
10.5 |
| MAR |
10 |
10.5 |
| APR |
11 |
12 |
| MAY |
9.5 |
10 |
| JUN |
9.5 |
9.5 |
| JUL |
10 |
9.5 |
| AUG |
8.5 |
10.5 |
| SEP |
9.5 |
9.5 |
| twelve month average: |
10.5 |
10.7 |
| Ammonia |
Septic Tank Inffluent
|
E-Z Treat Effluent
|
| DEC-4 |
96 |
2.9 |
| FEB-27 |
92 |
2.2 |
| MAY-12 |
87 |
1.2 |
| SEP-14 |
94 |
1.6 |
E-Z Treat System Test Results
Year 2004-2005
| TEST DATES |
RESULTS BOD |
RESULTS TSS |
| OCT - 15 |
9 |
9 |
| NOV - 17 |
11 |
11 |
| DEC - 9 |
10 |
11 |
| JAN - 19 |
12 |
10 |
| FEB - 11 |
11 |
11 |
| MAR - 10 |
12 |
10 |
| APR - 20 |
9 |
10 |
| MAY - 24 |
8 |
10 |
| JUN - 21 |
9 |
9 |
| JUL - 20 |
10 |
9 |
| AUG - 18 |
8 |
10 |
| YEARLY AVERAGE |
BOD 9.9 |
TSS 10 |
|